Scope

  • FERMA performed asbestos abatement in accordance with the hazardous materials survey, including removal and disposal of ACM and ACCM from interior and exterior building components across all structures.

  • Abatement activities included drywall, concrete, pipe insulation, mechanical gaskets, chalkboards, fire doors, ceramic mortars, heat shields, window glazing, coatings, roofing materials, and resilient flooring with associated mastics.

  • Asbestos removal was conducted in boiler rooms, crawlspaces, ceiling cavities, courtyards, cafeterias, and roof assemblies following approved containment and work procedures.

  • Lead-containing materials were removed and disposed of per survey findings, including loose and flaking lead-based paint on interior and exterior surfaces.

  • Additional lead abatement included removal of battleship floor sheet materials within interior areas.

  • Universal waste was removed, recycled, or disposed of in compliance with regulations, including PCB-containing light ballasts and fluorescent lamps throughout the facility.