FERMA performed complete interior, structural, and asbestos abatement demolition of a six-level post-tension concrete parking garage (Building B185) and an adjacent three-story steel structure (Building B177).
Initial work on the parking garage included a full interior gut-out using skid steers and mini excavators to remove debris and prevent commingling of materials prior to structural demolition.
Structural demolition of the post-tension parking garage was executed in accordance with a stamped engineered demolition plan, utilizing a conventional top-down, bay-by-bay sequence with excavators and hydraulic hammers.