Job Overview |
|||||||
Structure: | 170000 SF | ||||||
Bid Schedule: | 16 weeks | ||||||
Actual Schedule: | 16 weeks | ||||||
Injuries: | 0 | ||||||
Recycling |
|||||||
Job Totals (tons) | 18,636 | ||||||
Recycled: | 99.9% | ||||||
Scope |
|||||||
Demolish (2) 6 story wings back to the historical building to remain. The job also included the interior demo of the historical building to remain. | |||||||
This include extensive saw cutting and concrete removal. Concrete building was crushed onsite alone with the material | |||||||
generated from the interior demo. | |||||||
Presidio Demo
San Francisco, CA.