• San Francisco, CA.
    San Francisco, CA. of
Presidio Demo
San Francisco, CA.
San Francisco, CA.
San Francisco, CA.
San Francisco, CA.

Job Overview

Structure: 170000 SF
Bid Schedule: 16 weeks
Actual Schedule: 16 weeks
Injuries: 0

Recycling

Job Totals (tons) 18,636
Recycled: 99.9%

Scope

Demolish (2) 6 story wings back to the historical building to remain. The job also included the interior demo of the historical building to remain.
This include extensive saw cutting and concrete removal. Concrete building was crushed onsite alone with the material
generated from the interior demo.