Job Overview |
|||||||
Structure: | |||||||
Bid Schedule: | 2 weeks | ||||||
Actual Schedule: | 1.1 weeks | ||||||
Injuries: | 0 | ||||||
Recycling |
|||||||
Job Totals (tons) | 495 | ||||||
Recycled: | 98.1% | ||||||
Scope |
|||||||
Demolish gantry belt stacker over existing belt system to remain. The belt was unharmed at the completion of the job and in | |||||||
working order. |